Architectural & Engineering Coordination
Wrapping the clinical brief in a buildable, code-compliant envelope
What this phase accomplishes
Healthcare architecture is governed by clinical workflow, equipment specifications and regulatory norms before aesthetics. Phase 04 is where Tesla Med Systems sits inside the design team — keeping the architect, MEP engineer, biomedical engineer and infection-control lead aligned through one accountable process.
What we deliver
- Architectural consulting on hospital-grade detailing, finishes and code compliance
- Medical planning sign-off on every room before it enters construction documentation
- Equipment-driven room design — vendor envelopes, swing radii, service clearances and weight loads baked into the drawings
- MEP coordination across mechanical, electrical, plumbing and medical-systems disciplines
- HVAC considerations including air changes per hour, filtration class, pressure relationships and humidity control by space type
- Electrical requirements with essential / critical / life-safety branch design and isolated-power systems where mandated
- Medical-gas planning — oxygen, vacuum, medical air, nitrous oxide, carbon dioxide — outlet counts, manifold sizing and alarms
- Radiation-protection requirements: shielding survey, lead and concrete thickness, RF cage geometry for MRI
- Sterile-workflow planning between dirty-to-clean processing flows in CSSD, OR and lab
Where projects typically fail — and how we fix it
Equipment vendors are selected after the room is built, forcing expensive rework
HVAC and medical gas are designed by the MEP engineer alone, without clinical input
Shielding errors are caught only at commissioning, requiring slab and wall demolition
What the client receives at the end
Every phase exits with concrete artifacts. These deliverables become inputs to the next phase, the project record for the client, and the evidence base for regulators and investors.
- 01Coordinated architectural set (concept → schematic → detailed → tender)
- 02MEP coordinated drawings (electrical, HVAC, plumbing, gases)
- 03Medical-equipment room data sheets per space
- 04Shielding survey signed by qualified medical physicist
